AI Data Centre Infrastructure: GPU, HPC & Liquid Cooling
Designing and operating high-density AI and HPC environments: 50-150 kW racks, liquid cooling, power distribution and commissioning.
Overview
AI and HPC workloads are pushing rack densities from single-digit kilowatts towards 50-150 kW per rack. This expert course explains what that means for power distribution, liquid cooling, structural loads, networking and operations, and how facilities are adapted or purpose-built for GPU clusters.
Learning Outcomes
On completion of this course, you will be able to:
- Explain the power and thermal behaviour of GPU-based AI workloads
- Plan power distribution for 50-150 kW racks
- Compare direct-to-chip, rear-door and immersion liquid cooling
- Describe CDU, manifold and facility-water interfaces, coolant quality and leak detection
- Define rack-to-facility interfaces for power, liquid and network
- Plan commissioning, monitoring and operation of liquid-cooled halls
Module Outline
- Module 1: AI and HPC workloads and their infrastructure demands
- Module 2: GPU servers and rack-scale systems
- Module 3: High-density power distribution and busway
- Module 4: Air cooling limits and liquid cooling options
- Module 5: Direct-to-chip cooling, CDUs and facility water loops
- Module 6: Immersion and rear-door heat exchangers
- Module 7: Coolant quality, leak detection and serviceability
- Module 8: Structural, weight and space considerations
- Module 9: Commissioning and testing of liquid-cooled systems
- Module 10: Operating AI halls: monitoring, telemetry and incident response
The module outline is indicative and may be refined as materials are updated.
At a Glance
Track: AI & Future Infrastructure
Level: Expert
Duration: approx. 32 hours (indicative)
Format: Self-paced downloadable materials with optional live online sessions
Assessment: module quizzes and a final assessment
Award: TDI certificate of completion
What’s Included
- Downloadable course handbook (PDF)
- Presentation slides for each module
- Practical checklists and worksheets
- Module quizzes to check your understanding
- Final assessment
- TDI certificate of completion
Ready to Start?
Buy the course materials to access them in your student account, or ask us about live sessions and group enrolment.
Who It’s For
- Experienced critical facilities and data centre engineers
- Infrastructure engineers supporting AI/HPC deployments
- Design, project and commissioning engineers
Prerequisites
Data Centre Infrastructure Specialist or Critical Power & Cooling, or equivalent experience.
Career Roles It Supports
- AI/HPC infrastructure engineer
- Critical facilities engineer (high density)
- Data centre design engineer
CONTINUE YOUR LEARNING
More in AI & Future Infrastructure
Related courses in the same track.
Professional
24 h indicative
AI Networking & High-Speed Optical Cabling
The physical layer of AI clusters: 400G/800G optics, InfiniBand and RoCE fabrics, and structured cabling for GPU pods.
Professional
16 h indicative
Sustainability & Energy Efficiency
Legal frameworks, efficiency metrics and technical measures for reducing energy and water use across data centres and telecom sites.
TDI certificates of completion are issued by TelecomDigitalInfra. They are not third-party certifications and do not imply accreditation by, or equivalence to, any external certification scheme. Some roles also require statutory or employer-specific qualifications.
Start This Course
Buy the course materials to access them in My Account, or contact us to discuss live sessions, group enrolment and corporate delivery.